New Killinghall gully.

Pedestrians in Killinghall will no longer have to dodge the puddles as a longstanding drainage problem has hopefully been resolved.  A large puddle in the road on the B6161 near the school has led to pedestrians regularly getting drenched by passing traffic.  The puddle formed after the road was reprofiled when the Chene Hall development was built.

After some lobbying by residents and local councillor Michael Harrison, the council has installed a new gully that should drain the water into the adjacent ditch.